The second week of the bathroom remodel brought an electrician to move an electrical box on the floor over to the wall, install light boxes for the vanity lights, install a can light above the shower, and install a dual switch to operate the can light and exhaust fan separately. A plumber also stopped by to cap an exhaust pipe that was used for the jacuzzi tub we no longer have. Brian continued with tearing down all the drywall, repairing the hole in the floor where the electrical box was, and installing insulation on the shower and outside walls. The tile contractor starts on Wednesday! Excited for that!
Brian working on tearing down the drywall.
Can light installed above the shower.
Insulation on the walls, floor patched, and electrical box moved to outside wall.
All ready for the tile work!